
Kennametal
4150295
27/64" GOdrill FOR CUT TAP | ACADEMY TOOL KIT | 4150295
Regular price
$88.97
Sale price
$81.34
/
-7 in stock
PLEASE NOTE: Due to overwhelming demand for this product, the manufacturer is experiencing unexpected shipping delays beyond our control.
Stock Up on Your Favorite Lathe Tooling!- Solid Carbide drilling for diameter 1-20mm (0.0394"-0.7874") for 3-8 x D drilling capability
- Reduced friction and heat with Marginless design
- Through-coolant available down to 1mm (0.0394")
- TiN top layer serves as wear indicator
- Replacement GOdrill for the Rocket Tool Kit
- Steel, Stainless Steel, Cast Iron, High-Temp Alloys; Non-Ferrous Materials, Hardened Materials
- Adapter Style: Straight-Cylindrical
- Coating: TiN
- Grade: KC7325
- Through Coolant: No
- Flute Type: Spiral
- Number of Flutes: 2
- Flute x Diameter Ratio: 3.5
- Flute Length (Inch): 2.1654"
- Flute Length (Metric): 55.000mm
- Overall Length (Inch): 4.0157"
- Overall Length (Metric): 102.000mm
- Shank Diameter (Inch): 0.4724"
- Shank Diameter (Metric): 12.000mm
- Shank Length (Inch): 1.7717"
- Shank Length (Metric): 45.000mm
- Maximum Drill Depth (Inch): 1.5748"
- Maximum Drill Depth (Metric): 40.000mm
- Drill Point Length (Inch): 0.072"
- Drill Point Length (Metric): 1.830mm
- Drill Point Angle): 140°
Country of Origin is subject to change.
Safety data sheets upon request.
With over 80 years as an industrial technology leader, Kennametal Inc. delivers productivity to customers through materials science, tooling and wear-resistant solutions. Customers across aerospace, earthworks, energy, general engineering and transportation turn to Kennametal to help them manufacture with precision and efficiency.
SHIPPING
- Orders are processed Monday-Friday and in the order they are received.
- Orders received after 5:00PM CST will be processed the next business day.
- Orders are sent via UPS Ground, unless otherwise specified. Shipping times vary by Brand.
- AMROK: 2-3 weeks
- Kennametal: 1-3 days
- Haimer: 3-5 days
- LNS: 3-5 days
- Mitee-Bite: 3-5 days
- Mitutoyo: 7-14 days
- Schunk: 3-5 days
- Tyrolit: 6-8 days
- Once your order has shipped, you will receive a confirmation email with tracking information.
- Orders placed outside of the United States may be subject to import and/or brokerage fees upon receipt of package. Check with your Package Carrier and Government for more information.
- Due to the global Pandemic and its effects on the supply chain, there may be unforeseen delays in some shipments.
RETURNS / REFUNDS / EXCHANGES
- Please review our RETURN / REFUND / EXCHANGE Policies page for more information.